Two PCBA quotes can differ by 30% and still be identical in scope — or be identical in price and completely different in what is delivered. Four items explain most of the gap, and only one of them is price.
"100 nF 0402" can be a Japanese branded X7R or an unbranded Y5V at a fraction of the cost. On a wide-temperature product the difference is a field failure; on a consumer product it may never show. The quote must state brand, series and temperature characteristic per line, or the comparison is meaningless.
Check: pick three critical lines and ask for the exact MPN and approved alternates.
This is the most common ambiguity. Some quotes include AOI and exclude X-Ray; some charge per BGA; some "sample" X-Ray free but bill it when a customer asks for 100%. For automotive, medical or compute boards, 100% X-Ray may be mandatory — so ask whether it is included, sampled, or extra, and at what price per board.
Check: ask for the inspection plan as a line item with pass/fail criteria and whether images are retained.
A laser stencil is a real cost, and a functional test fixture can cost more than the boards. Quotes differ on whether these are one-time engineering charges, amortised into unit price, or waived on reorders. Ambiguity here causes the "second order is cheaper but the invoice is not" conversation.
Check: ask explicitly which charges are one-time and whether they recur on reorders or revisions.
Every build has attrition; the question is who pays and at what rate. Consigned material that is short, or a batch needing rework, is priced differently by every supplier. Get the rules in writing: attrition allowance percentage, rework labour rate, and how scrapped customer material is handled.
Check: ask for the last three rework invoices (redacted) — a supplier with a real process has them.
Take any quote and ask the supplier to annotate it: brand and grade per critical line, inspection scope, one-time versus recurring charges, and excess/rework rules. A supplier who can annotate a quote in one pass quoted it from a real BOM. One who answers "it's all included" quoted a number, not a scope.
AOI in the line: whether it is inside the unit price is a quotation question, not a technical one
Send your Gerber and BOM and we will return a DFM review plus a line-item quote within 24 hours — material by brand and grade, inspection scope stated, one-time charges separated.