You provide Gerber, BOM and test requirements. We handle component selection advice, sourcing, kitting, assembly, testing and shipment through a single window — one accountable contact from RFQ to delivery.
You always know who holds your project. Every step below is logged in MES.
DFM review before quotation: footprint and land-pattern checks, BOM cross-reference, alternative-part suggestions, and a written list of risks — before you commit.
Authorized-channel sourcing with full traceability; on receipt, every reel is IQC-checked and logged with batch and date code into MES. MSD parts are baked per J-STD before use.
SMT, DIP, depaneling, conformal coating and functional test — the same 16-step controlled flow as all our production, with FAI confirmed by you before volume.
Anti-static packaging, export cartons, and a shipment package: AOI/X-Ray reports, test data and certificate of conformance as agreed.
Typical situations where turnkey wins — and when consigned may be better.
No China presence? We buy locally from Shenzhen's supply chain — faster response on shortage replacements and better landed cost.
We handle alternates and substitutions with your approval — sourcing is part of engineering, not an afterthought.
Your engineers review DFM and FAI results; your purchasing team stays out of 200 line items. We consolidate.
Engineers run a DFM review before quoting: we quote what we can build and state risks upfront. WhatsApp +86 136-8258-5455 or email coyo86@126.com — direct to the sales lead, no middlemen.