Certifications matter only if the daily system backs them up. Ours: MES binds every board to its materials, machines, parameters and inspections — from IQC to shipment.
All three are current. Verify numbers with the issuing bodies.



Not posters on a wall — these are the routines an auditor walks through.
FAI is not a glance: a full inspection run against the drawing, with the customer confirming results before volume. Any line or program change re-triggers FAI.
Order → fixed line, fixed stencil, fixed blade. Mid-run changes require FAI again. Materials, machines, parameters and inspections all bind to the board's barcode.
A batch ships only when its records are complete: AOI data, X-Ray results where applicable, test data, coating thickness. Missing record — no shipment.
Engineers run a DFM review before quoting: we quote what we can build and state risks upfront. WhatsApp +86 136-8258-5455 or email coyo86@126.com — direct to the sales lead, no middlemen.